Construction has begun on the eventual overpass at Old Lake Road (the East Columbus intersection with US 74/76. Trees are being cleared on the right-of-way on both sides, including most of the trees by the soccer field. Trees are being cleared for two possible roads beside and behind the school as well. Construction could take as long as two years for both the Old Lake and Chauncey Town Road overpasses. The East Columbus overpass will not have on or off-ramps. In the future, students and visitors not coming directly from Old Lake Road will have to use the new road behind the school, which will be connected to Chauncey Town Road.